Production floor digitization.
Unlocking working capital and production rhythm in a $7.5M modular facility.
The constraint
$950,000 was trapped in excess inventory, assembly delays were frequent, and buyer inquiries dropped off before consultation.
What changed
- Tied reorder minimums to live production schedules.
- Digitized floor SOPs with tablet milestone tracking.
- Aligned CRM progress payments with production stages.
Result
Stale stock was cleared, purchasing became schedule-led, and the floor gained a visible rhythm across structural, electrical, and finishing bays.
$420kworking capital unlocked
18%cycle time reduction
$95kannual cost saved