Case studies/Operations + Digital

Production floor digitization.

Unlocking working capital and production rhythm in a $7.5M modular facility.

The constraint

$950,000 was trapped in excess inventory, assembly delays were frequent, and buyer inquiries dropped off before consultation.

What changed

  • Tied reorder minimums to live production schedules.
  • Digitized floor SOPs with tablet milestone tracking.
  • Aligned CRM progress payments with production stages.

Result

Stale stock was cleared, purchasing became schedule-led, and the floor gained a visible rhythm across structural, electrical, and finishing bays.

$420kworking capital unlocked
18%cycle time reduction
$95kannual cost saved