Case studies/Operations + P&L

Fabrication scrap reduction.

Putting floor controls around material waste, rework, and production handoffs.

The constraint

A 16% scrap rate, high rework labor, and inconsistent CAD to floor handoffs had compressed operating margin to 4.5%.

What changed

  • Required CAD nesting approval before raw sheet cutouts.
  • Added workstation scrap logs and daily threshold boards.
  • Rebuilt stock rules to prevent off-cut hoarding.

Result

The floor gained a shared visual standard for waste and rework, with clearer ownership at each handoff.

6.5%scrap rate
$115kannual material savings
31%less rework labor